SECTION 04 // OPERATIONS

What You Don't See

PROJECT LEDGER V2.4
TECHNICAL OPERATIONAL MANUAL
humidity_percentage

Moisture Mapping

Thermal imaging and psychrometric sensor deployment to delineate affected areas.

calculate

Psychrometric Calculations

Thermodynamic analysis to determine exact evaporative potential and equipment needs.

description

Insurance Documentation

Comprehensive claims package prep including Xactimate line-item reconciliation.

settings_input_component

Equipment Adjustments

Real-time recalibration of LGR dehumidification and air movers based on GPP readings.

monitoring

Daily Monitoring

Iterative structural inspections to ensure drying goals are met within the 72-hour window.

photo_camera

Photo Management

Meticulous metadata-tagged visual evidence logs for liability and claim verification.

handshake

Vendor Coordination

Logistics management of specialized trades and material procurement pipelines.

hub

Communication

Multilateral stakeholder updates between adjusters, owners, and technicians.

engineering

Project Management

Critical path scheduling and resource allocation for high-efficiency restoration.

biotech

Third-Party Testing

Objective clearance testing for mold, asbestos, and structural integrity standards.

verified

Dry Standard Verification

Data-driven confirmation of equilibrium moisture content (EMC) targets.

school

Continuing Education

Ongoing IICRC certification and mastery of evolving industry safety protocols.

04
BUILT OX CONSTRUCTION
THEBUILTOX.COM
© 2024 BUILT OX CONSTRUCTION.
ALL RIGHTS RESERVED. OPERATIONAL SENSITIVE.